Carleon Estate Residential Subdivision, NSW
Rookwood Cemetery, NSW

WHAT OUR CLIENTS SAY...

"Cannot comment high enough on the service Triaxial delivered and would not hesitate to recommend to other organisations."

Rookwood

Barossa Chocolate Factory Dam, SA
New road within Kemps Creek Cemetery, NSW
Homebush Shoring, NSW

KEY PROJECTS

Goulburn River Rehabilitation, NSW

Rehabilitation of eroded banks of the Goulburn River through the Ulan coal mine, including a 2.6km diversion drain, 3km of rock revetment with 45,000 tonnes of basalt rock, and over 30,000sqm of batter revegetation.

Rookwood Cemetery, NSW

$20M of infrastructure upgrades to the oldest and largest working cemetery in Australia, including road and services networks, stormwater systems, traffic management and operational buildings such as a soil recycling facility and ‘Reflections Village’.

Natrio Asia Pacific Ground Improvement Piling, SA

Installation of almost 1,000 ‘Controlled Stiffness Column’ piles to improve reclamation land at the Port Adelaide site and cater for heavy bulk product storage loading on fill sub-grade.

Carleon Estate Residential Subdivision, NSW

Stages 1, 2 & 3 of the subdivision, including roads, stormwater, sewer and water supply along with Master planning of a further 2,000 future allotments.

Barossa Chocolate Factory Dam, SA

Upgrade of the existing 8.5ML dam to create a water feature for the new facility, including dividing internal wall, detention storage, overflow structure with drainage and integration with building columns and footings.

Homebush Shoring, NSW

Temporary shoring and permanent reinforced structure to support a 10m deep basement excavation for a residential apartment development.

Broadview Estate Residential Subdivision, NSW

68 half-acre allotment subdivision which included 1.6km of leading sewer and water supply along with roads, sewer, storm water drainage and water supply for the subdivision.

Singleton STP Inlet Works and Chemical Dosing, NSW

Triaxial were engaged for the detailed design of Singleton STP Inlet Works, Chemical Dosing Facility, three new sludge lagoons, six new drying beds and emergency bypass main. The project has been delivered with four separate Design and Construct contacts with KCE.

Avoca Lagoon Crossing Transfer Main, NSW

Triaxial were engaged to design the DN450 transfer main under Avoca Lagoon. The project has been delivered as a design and construct contract with Eire Constructions. The HDPE main was designed and constructed with trenchless technology under Avoca Lagoon and will secure water supply for the Central Coast suburbs of Avoca Beach, Copacabana and Macmasters Beach.

Rookwood Cemetery, NSW
Flood Modelling, NSW

KEY PROJECTS

Goulburn River Rehabilitation, NSW

Rehabilitation of eroded banks of the Goulburn River through the Ulan coal mine, including a 2.6km diversion drain, 3km of rock revetment with 45,000 tonnes of basalt rock, and over 30,000sqm of batter revegetation.

Rookwood Cemetery, NSW

$20M of infrastructure upgrades to the oldest and largest working cemetery in Australia, including road and services networks, stormwater systems, traffic management and operational buildings such as a soil recycling facility and ‘Reflections Village’.

Natrio Asia Pacific Ground Improvement Piling, SA

Installation of almost 1,000 ‘Controlled Stiffness Column’ piles to improve reclamation land at the Port Adelaide site and cater for heavy bulk product storage loading on fill sub-grade.

Carleon Estate Residential Subdivision, NSW

Stages 1, 2 & 3 of the subdivision, including roads, stormwater, sewer and water supply along with Master planning of a further 2,000 future allotments.

Barossa Chocolate Factory Dam, SA

Upgrade of the existing 8.5ML dam to create a water feature for the new facility, including dividing internal wall, detention storage, overflow structure with drainage and integration with building columns and footings.

Homebush Shoring, NSW

Temporary shoring and permanent reinforced structure to support a 10m deep basement excavation for a residential apartment development.

Broadview Estate Residential Subdivision, NSW

68 half-acre allotment subdivision which included 1.6km of leading sewer and water supply along with roads, sewer, storm water drainage and water supply for the subdivision.

Singleton STP Inlet Works and Chemical Dosing, NSW

Triaxial were engaged for the detailed design of Singleton STP Inlet Works, Chemical Dosing Facility, three new sludge lagoons, six new drying beds and emergency bypass main. The project has been delivered with four separate Design and Construct contacts with KCE.

Avoca Lagoon Crossing Transfer Main, NSW

Triaxial were engaged to design the DN450 transfer main under Avoca Lagoon. The project has been delivered as a design and construct contract with Eire Constructions. The HDPE main was designed and constructed with trenchless technology under Avoca Lagoon and will secure water supply for the Central Coast suburbs of Avoca Beach, Copacabana and Macmasters Beach.

What We Do - Avoca.jpg
Avoca Lagoon Crossing Transfer Main, NSW
What We Do - Singleton.jpg
Singleton STP Inlet Works and Chemical Dosing, NSW